The performance of a lift station is established long before it is a concrete structure with valves, pumps and piping. Flow calculations, site elevations systems pressure water properties, peak conditions maintenance access, controls, and capacity in the future all impact the type of structure that will eventually be built.

Project owners who want to evaluate the most effective lift station design the most relevant question isn’t just who can design pumps. It’s who is able to translate site conditions and operating requirements into a complete system that is practical to build, operate and maintain.

Image credit: romtecutilities.com

Gravity Has its Limits

Gravity is often the easiest way to move wastewater. However, terrain and building patterns can make this difficult. New commercial, residential and industrial buildings may be too low, too far away, or in locations where extending gravity sewers isn’t feasible.

A lift station will provide the required force mechanically to transport water from one location in the collection system to another. However, designing one requires understanding normal operations as well as more difficult circumstances like a high flow or maintenance of pumps malfunctioning equipment or future rises in demands.

Companies considered among the best wastewater designers should therefore evaluate the entire conveyance problem rather than treating the station as an isolated piece of equipment.

The existing infrastructure makes the puzzle harder

The issue isn’t building new structures. Municipalities often have to retrofit or replace old stations, while also keeping the essential sanitation infrastructures in operation.

Existing infrastructure, such as wet wells and force mains, control systems, site boundaries, and downstream infrastructure, could limit the design. Engineers must decide which elements can be reused, what must be replaced and how the new components can be integrated into the existing system.

Romtec Utilities has experience in commercial, commercial, and private applications, as also retrofit and replacement projects. This permits pumping systems to be adapted to the specific ownership and operational requirements of each project.

Stormwater is governed by a variety of rules

The top engineers of stromwater systems employing the search terms that are provided will overcome a different hydraulic issue. Stormwater systems can experience dramatic fluctuations in volume based on the rainfall, drainage area capacity of detention, as well as allowable discharge rates.

A facility that serves a detention basin, for instance could require holding the runoff indefinitely and then pump it at an appropriate rate. Engineers should take into consideration the head and flow conditions, environmental requirements as well as flood management goals and the specifics of the drainage system used to receive it.

Prefabrication could move work from the worksite

The difficulty of field assembly could create scheduling conflicts, errors in installation, changes orders and delays. Romtec Utilities uses substantial prefabrication before equipment reaches the project site.

By completing more assembly and quality assurance work in a controlled environment, you can reduce the amount of construction required on the ground. Romtec Utilities’ project approach can speed up the duration required to set up certain installations.

A commitment to the success of engineering includes the commissioning process.

It’s not enough just to have all the components installed for a facility to be considered a reliable one. Romtec Utilities offers installation advisors for assistance with construction that includes starting up check of the control panel and pump operation, system testing, and training for personnel. The documentation also provides operators with information they can use when repairing the system or considering the possibility of expansion in the future.

This final stage is important for those who are looking for the best lift station designs. The end result of good engineering will be more than the creation of a few acceptable sketches. The station owner should leave with a functioning system, well-trained personnel, helpful documentation and equipment designed to meet the daily operating conditions of the facility.